Categories | Carrier HVAC Manuals, HVAC Heating Ventilating Air Conditioning Manuals |
---|---|
Tags | Carrier 58D, Carrier 58S |
Download File |
|
Language | English |
Product Brand | Support Phone Number: In North America, please call 1-800-CARRIER for immediate customer assistance from 8:00a -5:00p (EST) weekdays, Heating, Ventilating and Air Conditioning - HVAC |
Document File Type | |
Publisher | corp.carrier.com |
Wikipedia's Page | Carrier Corporation |
Copyright | Attribution Non-commercial |
Vent Terminal Cover Kit Installation Instructions Part No. 58SXB900 041 and 051 NOTE: Read the entire instruction before starting the installation. INTRODUCTION This instruction covers the installation of Vent Terminal Cover Kit Part No. 58SXB900 041 or 051 on Model 58DX, DXA, DXC, SX, SXA, SXB, and SXC Gas-Fired Condensing Furnaces. The kit is designed to improve the appearance of the vent termination.
DESCRIPTION AND USAGE Vent Terminal Cover Kit, Part No. 58SXB900 041 is designed for use with Vent Terminal Kit Part No. 58SX-900 001 and 58SXA900 031. Vent Terminal Cover Kit Part No. 58SXB900–051 is designed for use with Vent Terminal Kit Part No. 58SX-900 011 and 58SXA900 041. In addition to the following instructions, refer to the Vent Terminal Kit Installation Instructions and the furnace Installation Instructions for information and requirements. Terminal cover dimensions for the 2-in. kit are 11 X 18-1/2 X 6-1/2-in. Terminal cover dimensions for the 3-in. kit are 13-3/4 X 20 X 9-1/4-in. These cover dimensions include a 3/4-in. flange on both sides and the top. Pipe cement and primer used for the combustion-air and vent piping are recommended for gluing applications outlined in this instruction if used sparingly. Other adhesives, such as GE RTV 122 or 162 can be used sparingly in place of the cement on the installation of this kit–they are not acceptable for assembling the piping. All adhesive must be set and cured (see instructions on adhesive container) before cover is installed and furnace is operated. NOTE: This kit is to be used only for sidewall termination as shown in Fig. 2 or Fig. 3. The Vent Terminal Cover Kit contains the following items: Terminal cover Terminal cover plate Plastic screen Installation Instructions Step 1–Terminal Cover Installation (1) (1) (1) (1) adhesive has set before continuing installation. 3. Position terminal cover and attach it to structure. Vent pipe should extend approximately 1/2 inch through hole of cover plate. (See Fig. 4.) a. Drill holes in terminal cover side flanges at best locations for attachment to structure. b. Brick structures may require installation of plastic anchors in mortar joints to permit attachment of terminal cover. c. Structures with siding: locate holes where terminal cover comes in contact with siding if possible. NOTE: Combustion-air piping must be at least 1/2 inch from screening (on bottom of terminal cover) after cover is attached to structure. 4. If desired, cut and insert screening into vent pipe to obstruct foreign objects from entering piping.