Carrier 58MVP 5SI Gas Furnace Owners Manual

Product Specification
CategoriesCarrier HVAC Manuals, HVAC Heating Ventilating Air Conditioning Manuals
Tags
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 40 pages
LanguageEnglish
Product BrandSupport Phone Number: In North America, please call 1-800-CARRIER for immediate customer assistance from 8:00a -5:00p (EST) weekdays, Heating, Ventilating and Air Conditioning - HVAC
Document File TypePDF
Publishercorp.carrier.com
Wikipedia's PageCarrier Corporation
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

58MVP 4-Way Multipoise Variable-Capacity Condensing Gas Furnace Installation, Start-Up, and Operating Instructions For Sizes 040–120 Series 121 ® ama CANADIAN GAS ASSOCIATION A PP R O VED R A93040 NOTE: Read the entire instruction manual before starting the installation. This symbol indicates a change since the last issue. Index Page As an ENERGY STAR Partner, Carrier Corporation has determined that this product meets the ENERGY STAR guidelines for energy efficiency.

AIRFLOW DIMENSIONAL DRAWING 2 SAFETY CONSIDERATIONS .3 Clearances to Combustibles 3 ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS 3-4 INTRODUCTION 4 APPLICATIONS 4-11 General 4 Upflow Applications 4-6 Downflow Applications .7-8 Horizontal Left (Supply-Air Discharge) Applications .8-9 Horizontal Right (Supply-Air Discharge) Applications .9-11 LOCATION 11-13 General .11-12 Low-Fire Only Installation .12 Furnace Location Relative to Cooling Equipment 12 Hazardous Locations .13 INSTALLATION 13-17 Leveling Legs (If Desired) .13 Installation On a Concrete Slab .13 Installation On a Combustible Floor (Downflow Applications) 13-14 Installation In Horizontal Applications 14 Filter Arrangement 14 Bottom Closure Panel .15 Gas Piping 15-17 ELECTRICAL CONNECTIONS .17-20 115-v Wiring 17-19 24-v Wiring .19 Accessories 19-20 DIRECT VENTING .20-28 Removal of Existing Furnaces from Common Vent Systems 20-21 Combustion-Air and Vent Piping .21-25 Concentric Vent and Combustion-Air Termination Kit Installation 25-28 Multiventing and Vent Terminations .28 CONDENSATE DRAIN 28-30 General 28 Application 28 Condensate Drain Protection .28-30 UPFLOW HORIZONTAL LEFT DOWNFLOW AIRFLOW HORIZONTAL RIGHT AIRFLOW AIRFLOW Fig. 1–Multipoise Orientations A93041 SEQUENCE OF OPERATION 30-33 Self-Test Mode 30 Heating Mode 30-31 Heating Mode–Two Stage 31 Emergency Heat Mode .31 Cooling Mode .31 Heat Pump Mode .31-32 Continuous Fan Mode 32 Component Test 32 Bypass Humidifier Mode 32 Dehumidification Mode 33 Zone Mode 33 START-UP PROCEDURES 33-38 General 33 Select Setup Switch Positions .33-34 Prime Condensate Trap With Water 34 Purge Gas Lines 34 Adjustments .34-38 Set Gas Input Rate 34-37 Set Temperature Rise 37-38 Set Thermostat Heat Anticipator 38 CHECK SAFETY CONTROLS 38 Check Primary Limit Control .38 Check Pressure Switch .38 CHECKLIST .38-39 Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website